Doel 2 manually stopped
The shut down of the unit has passed safely and in accordance with the procedures. All authorities concerned were notified immediately. The alternator is located in the non-nuclear part of the unit and is cooled with hydrogen.
After analysis, repair and checks, the unit was reconnected to the grid Saturday July 17.