The hydrogen flakes in the walls of the reactor vessel of Tihange 2 have not evolved and no new indications have been added. This is the result of a follow-up inspection, which was carried out during the planned overhaul of Tihange 2. The Federal Agency for Nuclear Control has therefore no objection to the restart of the reactor.